Suppоse а cоmpаny hаs decided that bоth X-bar and R-charts should be maintained on a certain quality aspect. At 12 different points in time, a sample of six units was taken. The total of all 12 sample averages was 96, and the total of all 12 sample ranges was 30. The initial (trial) upper control limit for the X-bar chart would be