GradePack

    • Home
    • Blog
Skip to content
bg
bg
bg
bg

Author Archives: Anonymous

A warehouse began the month of October with 300 tons of good…

A warehouse began the month of October with 300 tons of goods, but its inventory had fallen to 100 tons at the beginning of November, before increasing again to 200 tons at the beginning of December.  Which of the following best describes the change in average monthly inventory from October to November?

Read Details

Which of the following best describes some of the events tak…

Which of the following best describes some of the events taking place in Week 3 at your facility?             I.  An order for 50 A’s will be placed (planned order releases).             II. An order for 100 B’s will be placed (planned order releases).             III An order for 100 D’s will be placed (planned order releases).

Read Details

Using your MRP schedule for the next nine weeks, how much of…

Using your MRP schedule for the next nine weeks, how much of Part D will be received Week 5 ?

Read Details

Samples of 100 parts each were taken from an ongoing process…

Samples of 100 parts each were taken from an ongoing process to establish a P chart for quality control. The number of defectives in each sample are shown in the table below.  Using the information given, calculate upper control limits based on 3 standard deviations (Z=3). Number of Defects in Samples 10 15 5 Calculate upper control limits that allow 3 standard deviations (Z=3). 

Read Details

In order to succeed in this course, students will need to de…

In order to succeed in this course, students will need to dedicate time and effort like an on-campus course. Students will need to generally dedicate 1-3 hours of studying for every credit hour. THIS CLASS REQUIRES 6-9 hours a week of studying to be successful!

Read Details

[8-10] Consider the following three jobs:  Job Oscar require…

[8-10] Consider the following three jobs:  Job Oscar requires two weeks of work and is due in four weeks.  Job Lima requires three weeks of work and is due in five weeks.  Job Denver requires one week of work and is due in three weeks.  Please answer the next three questions, based on this information: Job Duration (weeks) Due (weeks) Oscar 2 4 Lima 3 5 Denver 1 3 If these jobs are completed in alphabetical order, what is the tardiness associated with Job Oscar?

Read Details

Suppose you have three jobs waiting to be completed, and you…

Suppose you have three jobs waiting to be completed, and you must determine the sequence in which these jobs should be worked on.  You calculated the critical ratio for each of the jobs and the results were that Job A has a critical ratio of -0.37, Job B has a critical ratio of 1.89, and Job C has a critical ratio of 0.05.   Which of the following is true?  I.  Job A should go first, according to the critical ratio rule. II. Job B is already late. III. Job C isn’t late right now, but it will be late, no matter where you put it in the sequence.

Read Details

Quality Function Deployment (QFD) analysis can help build a…

Quality Function Deployment (QFD) analysis can help build a bridge between the older definition of quality and newer definition of quality.

Read Details

Suppose it takes 5 days for an order to arrive. If you are r…

Suppose it takes 5 days for an order to arrive. If you are responsible for the inventory management, what is the reordering point?

Read Details

Giving the following situation, a bottling factory for Pepsi…

Giving the following situation, a bottling factory for PepsiCo wants to know if they are filling their 1-liter bottles with the correct amount of Pepsi.  They will take samples of filled bottles from the filling process and measure how much soft drink is in each bottle. Which quality control method of those listed below would be the most appropriate to answer their question. 

Read Details

Posts pagination

Newer posts 1 … 206 207 208 209 210 … 85,511 Older posts

GradePack

  • Privacy Policy
  • Terms of Service
Top