GradePack

    • Home
    • Blog
Skip to content
bg
bg
bg
bg

Author Archives: Anonymous

Which nutrient is necessary to fuel the brain for academic s…

Which nutrient is necessary to fuel the brain for academic success?

Read Details

A woman who is underweight has a higher risk for:

A woman who is underweight has a higher risk for:

Read Details

Which mineral is needed for the mineralization of bones and…

Which mineral is needed for the mineralization of bones and teeth?

Read Details

When is a person likely to induce catabolism?

When is a person likely to induce catabolism?

Read Details

  Pili and stalks enable bacterial  

  Pili and stalks enable bacterial  

Read Details

Unsaturated fatty acid chains:

Unsaturated fatty acid chains:

Read Details

What type of bond is formed between the two water molecules…

What type of bond is formed between the two water molecules below?

Read Details

Task variance 

Task variance 

Read Details

Suppose a manufacturer wants to develop a forecast for a new…

Suppose a manufacturer wants to develop a forecast for a new virtual reality headset. Which method will help the manufacturer capture the experience and intuition of their management team?

Read Details

Expected task time:  ES = Earliest Start = Max (EF of all im…

Expected task time:  ES = Earliest Start = Max (EF of all immediate predecessors) EF = Earliest Finish = ES + Activity time LF= Latest Finish = Min (LS of all immediate following activities) LS = Latest Start = LF  – Activity time Slack = LS – ES      or      Slack = LF – EF   Using Table 4, type in the correct whole number for each task’s expected task time (te) earliest start time (ES) earliest finish time (EF) latest start time (LS) latest finish time (LF), and Type Yes or No in the space provided to indicate whether the task is a critical task.   NOTE: If you are unable to select any of the cells toward the right-hand side of the PERT Table, please click on a cell within the same row on the left-hand side of the table and use the ‘Tab’ key to tab over to the cell you would like to edit.    Table 4 PERT Problem Project Tasks: Times Are in Hours.  Note:  Immed Predec=immediate predecessors, a=optimistic, m=most likely, b=pessimistic, te=expected task, ES=earliest start, EF=earliest finish, LS=latest start, LF=latest finish task times. Task Immed Predec a m b te ES EF LS LF Slack Critical (whole #) (whole #) (whole #) (whole #) (whole #) (whole #) (Yes/No) A — 5 6 7 [t1] [ES1] [EF1] [LS1] [LF1] [slack1] [critical1] B A 4 6 14 [t2] [ES2] [EF2] [LS2] [LF2] [slack2] [critical2] C A 3 6 9 [t3] [ES3] [EF3] [LS3] [LF3] [slack3] [critical3] D B, C 5 5 5 [t4] [ES4] [EF4] [LS4] [LF4] [slack4] [critical4]

Read Details