GradePack

    • Home
    • Blog
Skip to content
bg
bg
bg
bg

GradePack

What size beam spans from the kitchen column to the piano ro…

What size beam spans from the kitchen column to the piano room over the down portion of the stairs?

Read Details

What is the scale of the site plan?

What is the scale of the site plan?

Read Details

“11. If a dimension is shown as 20?-0? on the drawings, but…

“11. If a dimension is shown as 20?-0? on the drawings, but is scaled as 18ft-6in, which dimension is used?”

Read Details

7. Who shall provide the temporary heat needed to accomplish…

7. Who shall provide the temporary heat needed to accomplish the work?

Read Details

1. In which room is the water meter located”

1. In which room is the water meter located”

Read Details

What is the elevations for Top of footing __________________…

What is the elevations for Top of footing __________________________________________________________________________

Read Details

What is the size in acres of Lot 5?

What is the size in acres of Lot 5?

Read Details

8. What is the size of the main gas line from the meter”

8. What is the size of the main gas line from the meter”

Read Details

2. Give the pipe size of the supply line for the following i…

2. Give the pipe size of the supply line for the following items: A. Hot water heater EWH-1 B. Non-potable water line from meter C. Main domestic water line from meter D. HB-1 at main entry

Read Details

6. What is specifi ed for the typical metal roof decking in…

6. What is specifi ed for the typical metal roof decking in the hardlines and display atrium sales areas?

Read Details

Posts pagination

Newer posts 1 … 25,242 25,243 25,244 25,245 25,246 … 86,193 Older posts

GradePack

  • Privacy Policy
  • Terms of Service
Top