GradePack

    • Home
    • Blog
Skip to content
bg
bg
bg
bg

GradePack

Task variance 

Task variance 

Read Details

Suppose a manufacturer wants to develop a forecast for a new…

Suppose a manufacturer wants to develop a forecast for a new virtual reality headset. Which method will help the manufacturer capture the experience and intuition of their management team?

Read Details

Expected task time:  ES = Earliest Start = Max (EF of all im…

Expected task time:  ES = Earliest Start = Max (EF of all immediate predecessors) EF = Earliest Finish = ES + Activity time LF= Latest Finish = Min (LS of all immediate following activities) LS = Latest Start = LF  – Activity time Slack = LS – ES      or      Slack = LF – EF   Using Table 4, type in the correct whole number for each task’s expected task time (te) earliest start time (ES) earliest finish time (EF) latest start time (LS) latest finish time (LF), and Type Yes or No in the space provided to indicate whether the task is a critical task.   NOTE: If you are unable to select any of the cells toward the right-hand side of the PERT Table, please click on a cell within the same row on the left-hand side of the table and use the ‘Tab’ key to tab over to the cell you would like to edit.    Table 4 PERT Problem Project Tasks: Times Are in Hours.  Note:  Immed Predec=immediate predecessors, a=optimistic, m=most likely, b=pessimistic, te=expected task, ES=earliest start, EF=earliest finish, LS=latest start, LF=latest finish task times. Task Immed Predec a m b te ES EF LS LF Slack Critical (whole #) (whole #) (whole #) (whole #) (whole #) (whole #) (Yes/No) A — 5 6 7 [t1] [ES1] [EF1] [LS1] [LF1] [slack1] [critical1] B A 4 6 14 [t2] [ES2] [EF2] [LS2] [LF2] [slack2] [critical2] C A 3 6 9 [t3] [ES3] [EF3] [LS3] [LF3] [slack3] [critical3] D B, C 5 5 5 [t4] [ES4] [EF4] [LS4] [LF4] [slack4] [critical4]

Read Details

Expected task time:  ES = Earliest Start = Max (EF of all im…

Expected task time:  ES = Earliest Start = Max (EF of all immediate predecessors) EF = Earliest Finish = ES + Activity time LF= Latest Finish = Min (LS of all immediate following activities) LS = Latest Start = LF  – Activity time Slack = LS – ES      or      Slack = LF – EF   Using Table 4, type in the correct whole number for each task’s expected task time (te) earliest start time (ES) earliest finish time (EF) latest start time (LS) latest finish time (LF), and Type Yes or No in the space provided to indicate whether the task is a critical task.   NOTE: If you are unable to select any of the cells toward the right-hand side of the PERT Table, please click on a cell within the same row on the left-hand side of the table and use the ‘Tab’ key to tab over to the cell you would like to edit.    Table 4 PERT Problem Project Tasks: Times Are in Hours.  Note:  Immed Predec=immediate predecessors, a=optimistic, m=most likely, b=pessimistic, te=expected task, ES=earliest start, EF=earliest finish, LS=latest start, LF=latest finish task times. Task Immed Predec a m b te ES EF LS LF Slack Critical (whole #) (whole #) (whole #) (whole #) (whole #) (whole #) (Yes/No) A — 2 7 12 [t1] [ES1] [EF1] [LS1] [LF1] [slack1] [critical1] B — 6 9 12 [t2] [ES2] [EF2] [LS2] [LF2] [slack2] [critical2] C — 7 9 17 [t3] [ES3] [EF3] [LS3] [LF3] [slack3] [critical3] D A, B, C 11 11 11 [t4] [ES4] [EF4] [LS4] [LF4] [slack4] [critical4]  

Read Details

The term concurrent analysis is also known as: 

The term concurrent analysis is also known as: 

Read Details

Jennifer Smith called General Hospital’s Release of Informat…

Jennifer Smith called General Hospital’s Release of Information (ROI) department and asked Mary Lawrence to send a copy of her aunt Linda Smith’s medical record. Mary Lawrence complied. What kind of breach did she commit?

Read Details

Healthcare consumers refer to the Health Insurance Portabili…

Healthcare consumers refer to the Health Insurance Portability and Accountability Act as:

Read Details

Multifactor productivity  If the post office uses 25 labor h…

Multifactor productivity  If the post office uses 25 labor hours at $ 16.50/hour, material cost $2 per customer, and overhead cost $ 0.75 per customer to serve 433 customers, then multifactor productivity is ______________ customers per dollar.  Enter the correct number to two decimal places.

Read Details

Following patient discharge, what is the time frame after wh…

Following patient discharge, what is the time frame after which a medical record is considered delinquent?

Read Details

Facilities need a constant cash flow and it needs to be effi…

Facilities need a constant cash flow and it needs to be efficient. What steps would help?

Read Details

Posts pagination

Newer posts 1 … 33,049 33,050 33,051 33,052 33,053 … 58,048 Older posts

GradePack

  • Privacy Policy
  • Terms of Service
Top