GradePack

    • Home
    • Blog
Skip to content
bg
bg
bg
bg

GradePack

A three-step production process is used to produce toy race…

A three-step production process is used to produce toy race cars and toy fire trucks.  Demand for race cars is 20 per hour, while demand for fire trucks is 30 per hour.  Implied utilizations have been calculated for the three machines as follows: Machine 1 2 3 Implied Utilization .75 1.20 .95 What will be the hourly flow rates in this process for race cars and fire trucks, respectively?  Round your answers to the nearest integer.

Read Details

The capacity of a nonbottleneck resource is _________ the ca…

The capacity of a nonbottleneck resource is _________ the capacity of the process.

Read Details

The _________ of a resource is how long that particular reso…

The _________ of a resource is how long that particular resource takes to complete one flow unit.

Read Details

According to the article “Operational Capabilities: Hidden i…

According to the article “Operational Capabilities: Hidden in Plan View” which of the following would be an example of a standard operational practice in a local coffee shop?

Read Details

The resource with the _________ is the bottleneck in a proce…

The resource with the _________ is the bottleneck in a process with multiple types of flow units.

Read Details

Which of the following statements about setups is FALSE?

Which of the following statements about setups is FALSE?

Read Details

The following process is used to produce widgets and gadgets…

The following process is used to produce widgets and gadgets.  The solid arrows show the flow path for widgets and the dashed arrows show the flow path for gadgets. Daily demand is for 200 widgets and 150 gadgets.  What will be the daily demands on the five resources?

Read Details

Metal tags for industrial use are produced in the process sh…

Metal tags for industrial use are produced in the process shown below.  Tags are made for all seven days of the week and each time the stamping machine switches from one day of the week to the next it requires a setup that takes 20 seconds.  The polishing machine requires no setups. What batch size should be chosen in order to minimize excess inventory without reducing the overall process flow rate?

Read Details

Process utilization is the ratio between _________ and _____…

Process utilization is the ratio between _________ and _________.

Read Details

Which of the following is an appropriate input at a bakery?

Which of the following is an appropriate input at a bakery?

Read Details

Posts pagination

Newer posts 1 … 42,944 42,945 42,946 42,947 42,948 … 70,114 Older posts

GradePack

  • Privacy Policy
  • Terms of Service
Top