GradePack

    • Home
    • Blog
Skip to content
bg
bg
bg
bg

GradePack

Post-implementation reports are formal reports or audits of…

Post-implementation reports are formal reports or audits of a project after it is up and running.

Read Details

Plunge implementation discards the legacy system completely…

Plunge implementation discards the legacy system completely and immediately migrates all users to the new system.

Read Details

Loose coupling is the capability of services to be joined to…

Loose coupling is the capability of services to be joined together on demand to create composite services, or disassembled just as easily into their functional component.

Read Details

Discovery prototyping builds a small-scale representation or…

Discovery prototyping builds a small-scale representation or working model of the system to ensure that it meets the user and business requirements.

Read Details

Information system control reports ensure the reliability of…

Information system control reports ensure the reliability of information, consisting of policies and their physical implementation, access restrictions, or recordkeeping of actions and transactions.

Read Details

What verifies that the units or pieces of code function corr…

What verifies that the units or pieces of code function correctly when integrated together?

Read Details

A dependency is a logical relationship that exists between t…

A dependency is a logical relationship that exists between the project tasks, or between a project task and a milestone.

Read Details

A kill switch is a logical relationship that exists between…

A kill switch is a logical relationship that exists between the project tasks, or between a project task and a milestone.

Read Details

User acceptance testing tests individual units or pieces of…

User acceptance testing tests individual units or pieces of code for a system.

Read Details

The rational unified process (RUP) methodology, owned by IBM…

The rational unified process (RUP) methodology, owned by IBM, provides a framework for breaking down the development of software into four gates.

Read Details

Posts navigation

Newer posts 1 … 44,763 44,764 44,765 44,766 44,767 … 53,405 Older posts

GradePack

  • Privacy Policy
  • Terms of Service
Top