GradePack

    • Home
    • Blog
Skip to content
bg
bg
bg
bg

GradePack

Match the type of specifications with the correct descriptio…

Match the type of specifications with the correct description

Read Details

Contractors typically mark up submittals in which color?

Contractors typically mark up submittals in which color?

Read Details

Explain three advantages of the Design-Build project deliver…

Explain three advantages of the Design-Build project delivery method.  

Read Details

Decentralized Organization

Decentralized Organization

Read Details

You are the project manager for a medium size construction f…

You are the project manager for a medium size construction firm responsible for a $12 million office building. This project was scheduled to be completed in 16 months. Upper management is reviewing the job status reports at the end of month four (4), and the reports say that the value of the work completed is $2.6 million. In addition, an important milestone date, completion of the window installation, is currently projected to be three weeks behind schedule. All window activities are on the critical path. At this time (end of month 4) the window shop drawings have been approved by the Architect, but the manufacturer has not yet started fabricating the windows.   Answer the following three questions about your project: Based on time only, what % complete should the project be at the end of the fourth (4th) month? How far behind is the job based on the dollar value of the work completed at the end of month 4? Provide at least three (3) action steps you would recommend the project implement to get back on schedule.  Explain the possible implications of each.   Two of your recommended actions must be specifically related to the window activities.  

Read Details

An effective value engineering study always leads to a lower…

An effective value engineering study always leads to a lower first (installation) cost to the Owner.  

Read Details

Part 3: Fill in the BlanksWord Bank for Questions 24 – 31:  …

Part 3: Fill in the BlanksWord Bank for Questions 24 – 31:  performance, alternates, quality, substantial completion certificate, retainage, arrow diagram method (ADM), addenda, shuffle, prequalification, check out, predecence diagram method (PDM), set aside, Certificate of Occupancy (C of O), backward pass, calculation, commissioning, punch list, contingency, interview, financial.  

Read Details

Part 6: Extra Credit (OPTIONAL)

Part 6: Extra Credit (OPTIONAL)

Read Details

Which of the following bid documents contains additional or…

Which of the following bid documents contains additional or supplemental information to the design documents?

Read Details

A second tier subcontractor is a subcontractor who is workin…

A second tier subcontractor is a subcontractor who is working directly for the owner.  

Read Details

Posts pagination

Newer posts 1 … 63 64 65 66 67 … 79,732 Older posts

GradePack

  • Privacy Policy
  • Terms of Service
Top