In a SWaP budget flow-down from system to subsystem and from…
In a SWaP budget flow-down from system to subsystem and from subsystem to component, the sum total of the SWaP budgets across components must be equivalent to the [Answer1] budget and the sum total of the SWaP budgets across subsystems must be equivalent to the [Answer2] budget.