9. Using the cross sectional method, the volume of cut or fi…
9. Using the cross sectional method, the volume of cut or fill for grid number 26 in fig 1 is: The grids are 50 ft apart in both directions. The existing grade appears above the proposed grade. (B=bank, C=compacted). Fig. 1
Read Details