The fоllоwing is а prоduct structure tree for а toy cаlled zigzag robot (Z-robot). The manufacturer receives an order of 50 units of Z-robot that should be ready in week 10. The lead times for the components are Z (2 weeks), A (1 week), B (1 week), C (1 week), D (1 week), and E (3 weeks). None of these items has inventory on hand. ┌──┐ │ Z │ └──┘ / ┌───┐ ┌───┐ │A(2) │ │B(4) │ └───┘ └───┘ / ┌─-─┐ ┌-──┐ │C(3)│ │D(4)│ └-──┘ └-──┘ ┌-──┐ │ E(2)│ └-──┘ What is the gross requirements for item E?