During trenching operations, spoil piles are placed too clos…
During trenching operations, spoil piles are placed too close to the trench edge. The controls of engineering – relocate spoil piles 2 ft away, and administrative – assign a competent person to inspect trench safety daily, should be implemented.
Read Details